High Wall II
Back to High Wall I
Back to Contents and Directions
Eventually I got all the crossties in place. I left plenty of cracks and gaps and spaces between the ties;
habitat for the toads and lizards, you know.
ties-placed3.JPG (132766 bytes)
Then I ran the water line for the four spigots and filled in behind the wall with a mix of sandy dirt and compost.
fillingin2.JPG (134835 bytes)
To fill the gap between the crossties and the asphalt Mark and I used bagged pothole filler. Fun stuff to work with, buckets and trowels
and WD-40 to clean up - takes weeks to harden. You can also see, barely, the periwinkle taking hold at this end and the blue haze of petunias farther up.
asphalt1.JPG (129551 bytes)
-